Corporate Interior Systems'

Case Studies

Currently Viewing: Corporate

Desert Troon Companies

Case Study image

Desert Troon’s original space one Perimeter Drive was one of the first DIRTT projects in Arizona, completed 10+ year ago. As it was an early project, a number of innovation had occurred since its original construction; including integrated power, data, millwork and in-wall technology (displays). When Desert Troon decided to sell their building, they wanted to recreate their DIRTT Environment in their new spaces; specifically, the project rooms. Due to timing, Desert Troon relocated to a temporary space for approximately a year while their final destination was undergoing construction. They chose to build out both their temporary space (Grayhawk) and final location (The Peaks) with DIRTT Solutions, taking advantage of advances in DIRTT Solutions provide integrated technology and millwork along the way. Design was largely driven by Desert Troon Facilities team and CIS has limited opportunity to coordinate with PDO other than with regard to finishes.

View Case Study

Gate 6

Case Study image

Gate 6 is a growing graphic and web design services company who was looking to create a unique space that would meet their budget and be adaptable over time. As a young company, making the leap to their own building, budget and timeline were primary factors in the process. The unique applications, such as are found in the open office area of Gate 6, are examples of what is possible with Design Assist/Build capabilities of the CIS DIRTT Team.

View Case Study

JDA Software

Case Study image

A great deal of collaboration and exploration occurred to find the best solution for the needs of JDA. Once the design intent was solidified, the Design/Build Team and CIS DIRTT worked through the details and budget together to deliver the best project possible.

View Case Study

Russ Lyon Sotheby’s

Case Study image

Russ Lyon was looking for an integrated solution to build out an existing shell space with a modern and flexible format. Ware Malcomb had created a test fir for the space and brought the project to an SD level of detail, at which point the CIS DIRTT Team was brought in by the owner and the decision was made to proceed with DIRTT as the primary solution for construction. Ware Malcomb provided collaboration, coordination and complimentary design services on the conventional construction side, which included the MPE disciplines, ceiling/soffit and lighting. The remainder of the Design was largely driven by the Client through the CIS DIRTT Team and collated with eh Designer’s efforts. The contractor was provided by the building to provide conventional construction renovations and connections to the DIRTT Solutions throughout the space.

View Case Study