DIGG

Case Studies

Currently Viewing: Interior Construction

JDA Software

Case Study image

A great deal of collaboration and exploration occurred to find the best solution for the needs of JDA. Once the design intent was solidified, the Design/Build Team and CIS DIRTT Team worked through the details and budget together to deliver a technology-driven, one-of-a-kind space for JDA to showcase to potential clients and customers.

View Case Study

Desert Troon Companies

Case Study image

Desert Troon’s original space, One Perimeter Drive, was one of the first DIRTT projects in Arizona, completed 13+ years ago. When Desert Troon decided to sell their building, they wanted to recreate their DIRTT Environment in their new spaces, specifically, the project rooms. They chose to build out with DIRTT in both their temporary space (Grayhawk) and final location (The Peaks), capitalizing in DIRTT’s advances of integrated technology and millwork along the way.

View Case Study

Gate 6

Case Study image

Gate 6 is a growing graphic and web design services company who was looking to create a unique space that would meet their budget and be adaptable over time. As a young company, making the leap to their own building, budget and timeline were primary factors in the process. The unique applications, such as those found in the open office area of Gate 6, are examples of what is possible with the Design-Assist/Build capabilities of the CIS digg team.

View Case Study

Russ Lyon Sotheby’s

Case Study image

Russ Lyon was looking for an integrated solution to build out an existing shell space with a modern and flexible format. Ware Malcomb provided collaboration, coordination and complimentary design services on the conventional construction, which included the MPE disciplines, ceiling/soffit, and lighting. The remainder of the design was largely driven by the client through the CIS digg team and collated with the designer’s efforts.

View Case Study