Add pin info here

Add pin info here

Add pin info here

Add pin info here

Add pin info here

Add pin info here

Add pin info here

Add pin info here

Add pin info here

Click on the pins above for details

DIRTT Solutions

DIRTT stands for Doing It Right This Time and DIRTT’s purpose is to re-envision the construction industry by leveraging technology to create nimble, sustainable and inspired spaces. This process is based around a custom software package working in conjunction with distributed high-capacity manufacturing of solutions which provides speed, durability, design and an environmentally sustainable platform. A platform which can grow, change and adapt to the needs of the users over time. DIRTT uses real-time, interactive 3D software called ICE®, for a fluid flow of information from design/pricing to the manufacturing and lifecycle maintenance of the installed solutions. The ICE® software allows our clients to provide design input early on, see how that information translates to the model and view their workspace in 2D and 3D long before the manufacturing begins.

View Our Case Studies
CIS image CIS image

Combining construction and technology

The CIS DIRTT Team is a division of Corporate Interior Systems that uses software and manufacturing to design and fabricate interior construction. DIRTT, our integrated partner, is a technology company that manufactures everything from walls, power, and data to millwork.

Contact Us

“I recognize the value their level of service and professionalism brings to each project. As well, I know CIS has a team who cares about their customers and the workplace environments they are creating.”

David Ramirez, TEPCON Construction

How CIS architectural solutions integrates into your project

The graphic below details the phases within the project that CIS executes simultaneously with the design and construction processes. We act nimbly and adjust according
to the phase in which we enter the project while simultaneously ensuring that clear communication continues throughout the life of the project.

1
2
3
4
5
6
7

Education & Evaluation

DIRTT Education

Green Learning Centers

DIRTT Factory

Local Projects

Case Studies

Programing

Programatic Uses

Project Milestones

Technology Integration

Data Infrastructure

Flexibility (Now/Future)

Major Systems Decisions

DIRTT / Conventional Planning

Planning

Typical development

First Budget

Project Schedule Integration

Growth & Flexibility Plan

Added Value Discussion

Adaptation Variables Furniture Accommodation

Schematic Design

Usage Review

Plan/Layout Review

GC Estimation Review
Trade Coordination

Finish Discussion

Hardware Review

Millwork Review

Installation Criteria

Design Development

ICE Renderings

ICE Fly Through/VR

Revised Budget

Critical Timelines

Finish Review

Furniture Coordination

Graphics Review

P.O. Review

Revisions as Required

Construction Documents

Signed PO

DIRTT Shop Drawings

Millwork Shops

Materials Sign-Off

Revised Visuals

Alternates and Deliverables

Final Coordination w/ Design Team

Construction Administration

Delivery Coordination

Installation (Frames)

Inspection (GC)

Data/Power Connections

Tech Integration

Millwork Install

Installation (Finish Tiles)

Review & Warranty

Training

Education & Evaluation

DIRTT Education

Green Learning Centers

DIRTT Factory

Local Projects

Case Studies

Programing

Programatic Uses

Project Milestones

Technology Integration

Data Infrastructure

Flexibility (Now/Future)

Major Systems Decisions

DIRTT / Conventional Planning

Planning

Typical development

First Budget

Project Schedule Integration

Growth & Flexibility Plan

Added Value Discussion

Adaptation Variables Furniture Accommodation

Schematic Design

Usage Review

Plan/Layout Review

GC Estimation Review
Trade Coordination

Finish Discussion

Hardware Review

Millwork Review

Installation Criteria

Design Development

ICE Renderings

ICE Fly Through/VR

Revised Budget

Critical Timelines

Finish Review

Furniture Coordination

Graphics Review

P.O. Review

Revisions as Required

Construction Documents

Signed PO

DIRTT Shop Drawings

Millwork Shops

Materials Sign-Off

Revised Visuals

Alternates and Deliverables

Final Coordination w/ Design Team

Construction Administration

Delivery Coordination

Installation (Frames)

Inspection (GC)

Data/Power Connections

Tech Integration

Millwork Install

Installation (Finish Tiles)

Review & Warranty

Training